Services Provided

  • Underground Reticulation
  • EV Charger Installation
  • Power and Data Installation and Termination
  • Cable Tray Installation

Project Overview

Addelec engaged our team to install EV chargers for parking at an educational facility on the Sunshine Coast. The scope included:

  • Underground power supply to 1 x ABB Terra DC Wall Box 24kW Charger
  • Underground power supply to 1 x Dual ABB 7kW Charger
  • Concrete foundations for both chargers
  • Installation of cable tray for power and data to 12 x ABB 7kW AC chargers
  • Installation of a total of 15 EV chargers
  • Data network installation and termination using Cat6a shielded cabling, including mounting and connection of LMS enclosure
  • All trenching works
  • Backfill and compaction of trenches
  • Installation of topsoil

Challenges & Solutions

Challenge

Solution

Trenching was planned using a vacuum truck, but noise restrictions prevented its use on the day of commencement.

Additional manpower was brought in to manually dig trenches and foundations, ensuring timely completion without delays.

Chargers shared power supply with operational learning facilities.

Maintained strong communication with stakeholders and arranged a backup generator to power the park during changeover where needed.

Multi-party communication between our team, Addelec, and the educational facility.

Established centralized communication protocols and held regular check-ins to ensure alignment.

Outcome

  • Project delivered on time
  • Met all technical and operational requirements
  • Infrastructure now supports high-speed EV charging
  • Educational facility remained functional throughout the build, with only a planned 2-hour shutdown
  • No noise complaints recorded
  • Stakeholders were kept informed and engaged

Client Benefit

This successful deployment sets a benchmark for future regional infrastructure projects.