Case Study: EV Infrastructure & Civil Works Deployment in Gayndah, QLD

Client: Addelec
Location: Gayndah, QLD
Budget: Not disclosed
Date: April 2025

Services Provided:

  • Civil Works
  • Underground Reticulation
  • Switch Board Installations
  • EV Charger Installation
  • Power and Data Installation and Termination
  • Relocation of Point of Supply to Road House (BP)

Project Overview

Addelec engaged our team to deliver a full-scale infrastructure installation in Gayndah, QLD, focused on deploying ABB EV charging systems and supporting electrical upgrades. The scope of work included:

  • Installation of a new 400A Main Switch Board
  • New aerial Point of Supply to the operational BP Roadhouse
  • Underground power supply to one ABB Terra 184 DC Fast Charger and one ABB 24kW DC chargers
  • Installation of the  2 x ABB Chargers
  • Installation of lighting with PE cell on the building
  • CCTV setup featuring a 270° fisheye camera
  • Data network installation and termination using Cat6a shielded cabling
  • All trenching works
  • Concrete foundations for chargers and MSB
  • Backfill and compaction of trenches
  • Reinstallation of asphalt
  • Installation of topsoil
  • Line marking of the site
  • Temporary fencing and waste disposal for the site

Challenges & Solutions

Challenge

Solution

Site located 238km from our home office, requiring complex logistics

Coordinated delivery schedules with Addelec and mobilized tools and equipment efficiently to and from site

BP Road House and sub-tenant shared the same power supply and needed to remain operational

Implemented staged work zones and clear signage to ensure uninterrupted access. Maintained strong communication with stakeholders to minimize impact

Coordination with DNSP (Ergon) for power integration

Scheduled DNSP activities in advance and maintained proactive communication

Multi-party communication between our team, Addelec, and NRMA

Established centralized communication protocols and held regular check-ins to ensure alignment

Outcome

The project was delivered on time and met all technical and operational requirements. The infrastructure now supports high-speed EV charging, enhanced lighting and surveillance, and robust data connectivity. The BP Road House remained functional throughout the build, with only a planned 4-hour shutdown, and all stakeholders were kept informed and engaged.

Client Benefit

The upgraded site offers improved safety, modern amenities, and future-ready EV infrastructure. Seamless coordination and execution ensured minimal disruption and maximum value for Addelec and the end customer, NRMA.

Additional Information

Photos from the site showcase the quality and precision of the completed work. This successful deployment sets a benchmark for future regional infrastructure projects.

Tagline

Efficient, future-ready infrastructure delivered with precision—238km from home base, zero compromise on quality.